Claims · Methodology Delay Analysis Techniques: Selecting and Applying the Right Methodology How to choose between CPM, APAB, TIA, and Windows Analysis. Strengths, limitations, and best practice application in FIDIC arbitration. 7 min read · Updated 24/04/2026 By Basel Al Najjar Civil Engineering Consultant, DIAC Arbitrator, Tribunal Chairman and Accredited Expert Witness. Over two decades …
Tag: acceleration impact analysis construction
Apr 24
Delay Analysis Techniques: Selecting the Right Methodology | E-Basel
- By Basel Al Najjar in Construction Claims
-
April 24, 2026
- acceleration impact analysis construction, as-planned as-built analysis, baseline vs as-built programme analysis, concurrent delay identification techniques, construction arbitration delay analysis, contract programme compliance analysis, CPM scheduling delay analysis, critical path method delay, critical path validation techniques, delay allocation methodologies, delay analysis best practices construction, delay analysis techniques construction, delay causation analysis construction, delay claim substantiation techniques, delay damages assessment techniques, delay event identification methods, delay expert report methodology, delay methodology selection, delay mitigation evaluation techniques, delay modelling software Primavera P6, delay quantification methods construction, dynamic vs static delay analysis, earned value delay indicators, FIDIC delay analysis approaches, float analysis construction delay, forensic delay analysis construction, fragnet analysis construction delays, impacted as-planned method, Monte Carlo simulation schedule delays, near-critical path delay analysis, productivity loss vs delay analysis, programme disruption analysis methods, prolongation cost analysis methods, retrospective vs prospective delay analysis, schedule impact modelling construction, schedule risk analysis delay, schedule update analysis delay, SCL delay analysis protocol, time impact analysis, windows analysis delay
Permanent link to this article: https://www.e-basel.com/construction-claims/delay-analysis-techniques-selecting/
Authority Bio
Basel Al Najjar
Civil Engineering Consultant · Accredited Expert Witness
Arbitrator · Senior Project Manager
Specialising in construction claims, FIDIC contracts, and dispute resolution across the UAE. Acting as Arbitrator, Tribunal Chairman, and Independent Expert in high-value, multi-party disputes.
Instruct e-Basel →Core Services Quick-Links
⚖️
Construction Claims Consultant
›
📋
FIDIC Expert Witness
›
📊
Delay Analysis Expert
›
🏛️
Construction Arbitrator
›
A one-page summary of critical notice deadlines across FIDIC Red, Yellow, and Silver Books. Free for subscribers.
No spam. Unsubscribe at any time.
Select your contract edition and book, choose the relevant clause, then enter the date you became aware of the triggering event. All applicable notice deadlines will be calculated instantly.
The date you became aware, or should have become aware, of the event giving rise to the claim or notice obligation.
Key Notice Periods at a Glance
- 1999 editions — Cl. 20.1 Notice: 28 days · Detailed Claim: 42 days
- 2017 editions — Cl. 20.2 Notice: 28 days · Detailed Claim: 84 days
- Unforeseeable Conditions (Cl. 4.12): Notice as soon as practicable
- Defects Notification Period: 365 days from Taking-Over Certificate
"Time at Large removes the Employer's right to deduct liquidated damages — the consequences are severe and often irreversible."
Time at Large & the Prevention Principle in UAE Construction Contracts
Facing a construction dispute or claim?
Request a confidential consultation with a UAE-accredited Expert Witness and Arbitrator.
Request a Consultation →Confidential · No obligation · UAE-based
Facing a construction dispute or claim?
Request a confidential consultation with a UAE-accredited Expert Witness and Arbitrator.
Request a Consultation →Confidential · No obligation · UAE-based