Claims » Extensions of Time As-Built Programme in Delay Analysis — Foundation of the EOT Claim In a delay claim, the as-built programme is the foundation on which everything else rests. It records what actually happened on the project. Without a credible as-built, the delay analysis floats free of the factual record — and is …
Tag: SCL Protocol
Permanent link to this article: https://www.e-basel.com/construction-claims/as-built-programme-for-delay-claims-scl-protocol-e-basel/