متحف المستقبل | أجمل مبنى في العالم | أيقونة دبي الجديدة دبي تفتتح – متحف المستقبل – أيقونة معمارية هي الاجمل على وجه الأرض متحف المستقبل دبي والعالم على موعد وحدث مهم اليوم حيث يشهد صاحب السمو الشيخ محمد بن راشد آل مكتوم، نائب رئيس الدولة رئيس مجلس الوزراء حاكم دبي رعاه الله-، وعدد من …
Tag: أجمل
Feb 22
متحف المستقبل | أجمل مبنى في العالم | أيقونة دبي الجديدة
- By Basel Al Najjar in Uncategorized
-
February 22, 2022
- Architectural masterpiece, Art and science, Artistic expression, Avant-garde design, Contemporary art, Cultural center, Cutting-edge technology, Digital art, Dubai's new icon, Eco-friendly design, Futuristic museum, Green building, Iconic architecture, Iconic landmark, Iconic skyline, Innovative design, Innovative museum, Interactive exhibits, Modern architecture, Smart building, Sustainable building, Sustainable Development, Technology and art, Unique structure, World-class museum, أجمل, افتتاح, المستقبل, بالعالم, دبي, في العالم, مبنى, متحف, مكان
Permanent link to this article: https://www.e-basel.com/uncategorized/%d9%85%d8%aa%d8%ad%d9%81-%d8%a7%d9%84%d9%85%d8%b3%d8%aa%d9%82%d8%a8%d9%84-%d8%a3%d8%ac%d9%85%d9%84-%d9%85%d8%a8%d9%86%d9%89-%d9%81%d9%8a-%d8%a7%d9%84%d8%b9%d8%a7%d9%84%d9%85-%d8%a3%d9%8a/
Authority Bio
Basel Al Najjar
Civil Engineering Consultant · Accredited Expert Witness
Arbitrator · Senior Project Manager
Specialising in construction claims, FIDIC contracts, and dispute resolution across the UAE. Acting as Arbitrator, Tribunal Chairman, and Independent Expert in high-value, multi-party disputes.
Instruct e-Basel →Core Services Quick-Links
⚖️
Construction Claims Consultant
›
📋
FIDIC Expert Witness
›
📊
Delay Analysis Expert
›
🏛️
Construction Arbitrator
›
A one-page summary of critical notice deadlines across FIDIC Red, Yellow, and Silver Books. Free for subscribers.
No spam. Unsubscribe at any time.
Select your contract edition and book, choose the relevant clause, then enter the date you became aware of the triggering event. All applicable notice deadlines will be calculated instantly.
The date you became aware, or should have become aware, of the event giving rise to the claim or notice obligation.
Key Notice Periods at a Glance
- 1999 editions — Cl. 20.1 Notice: 28 days · Detailed Claim: 42 days
- 2017 editions — Cl. 20.2 Notice: 28 days · Detailed Claim: 84 days
- Unforeseeable Conditions (Cl. 4.12): Notice as soon as practicable
- Defects Notification Period: 365 days from Taking-Over Certificate
"Time at Large removes the Employer's right to deduct liquidated damages — the consequences are severe and often irreversible."
Time at Large & the Prevention Principle in UAE Construction Contracts
Facing a construction dispute or claim?
Request a confidential consultation with a UAE-accredited Expert Witness and Arbitrator.
Request a Consultation →Confidential · No obligation · UAE-based
Facing a construction dispute or claim?
Request a confidential consultation with a UAE-accredited Expert Witness and Arbitrator.
Request a Consultation →Confidential · No obligation · UAE-based
