Extensions of Time What is Extension of Time (EOT)? Extension of Time (EOT) is a delay which could not be reasonably foreseen at the time of contract signing. The granting of an Extension of Time relieves the contractor from liability of damages such as Liquidated Damages from the original date of contract completion for the period …
Page Tags: employer
Permanent link to this article: http://www.e-basel.com/contractual/extensions-of-time/
FIDIC DBO Contract
FIDIC DBO Contract DBO Contract Conditions of Contract for Design, Build and Operate Projects First Edition 2008 Contents of Contract Book _ General Conditions _ Particular Conditions _ Sample Forms Following publication of the Orange Book in 1995 and the Red, Yellow and Green Books in 1999 it became clear that there was a growing need …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-dbo-contract/
FIDIC Silver Book
FIDIC Silver Book Introduction to FIDIC Silver Book Introduction FIDIC – the International Federation of Consulting Engineers – published in September 1999 a suite of four new Standard Forms of Contract. This new suite comprises: Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer : The Construction Contract Conditions of …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-silver-book/
FIDIC Orange Book
FIDIC Orange Book Orange Book Conditions of Contract for Design-Build and Turnkey First Edition 1995 Contents of Contract Book _ General Conditions _ Guidance for the Preparation of the Particular Conditions _ Forms of Tender and Agreement The Orange book was published in 1995 to provide a design and build option to the then current FIDIC …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-orange-book/
FIDIC Yellow Book
FIDIC Yellow Book FIDIC Yellow Book Conditions of Contract for Plant and Design-Build For electrical and mechanical plant, and for building works, designed by the Contractor First Edition 1999 The Yellow Book provides conditions of contract for construction works where the design is carried out by the Contractor. The current Yellow Book bears little resemblance to its predecessors. The …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-yellow-book/
FIDIC Red Book
FIDIC Red Book The New 2017 FIDIC Red Book FIDIC Red Book Introduction and FIDIC Core Principles Second Edition 2017 (first Ed 1999): Red Book – Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer; Yellow Book 1999 – Conditions of Contract for Plant and Design Build, for Electrical …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-red-book/
Design Issues
Design Issues Design Error, Modifications, Revisions, Approvals, Shop-drawings Clients, when appointing a designer, whether Architect, Engineering Consultant, or a Contractor ( Design and Built Contract), expect the building to operate when complete in the manner envisaged when appointment was made. If the building fails to meet the client’s expectations, there are often questions asked of …
Permanent link to this article: http://www.e-basel.com/contractual/design-error/