Does an Accepted Quotation by a Contractor/Subcontractor Include Result Delay Costs? Where a contractor/ subcontractor submits a quotation for extra work which is accepted, is the accepted quotation deemed to include for any result delay costs? In general, whether an accepted quotation for extra work includes result delay costs would depend on the specific terms …
Page Tags: Dispute resolution
Permanent link to this article: http://www.e-basel.com/articles/does-an-accepted-quotation-by-a-contractor-include-result-delay/
Permanent link to this article: http://www.e-basel.com/about-e-basel-com/founders-message/
Claims Under FIDIC Contract
Claims Under FIDIC Contract CLAIMS UNDER THE NEW FIDIC CONDITIONS OF CONTRACT Conditions of Contract for Construction, FIDIC Forms. It is known as ‘the Red Book’. The FIDIC Conditions are used extensively on international construction projects, notably for major infrastructure work. The FIDIC Forms are used on projects funded by the World Bank, and the drafts …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/claims-under-fidic-contract/
FIDIC DBO Contract
FIDIC DBO Contract DBO Contract Conditions of Contract for Design, Build and Operate Projects First Edition 2008 Contents of Contract Book _ General Conditions _ Particular Conditions _ Sample Forms Following publication of the Orange Book in 1995 and the Red, Yellow and Green Books in 1999 it became clear that there was a growing need …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-dbo-contract/
FIDIC Silver Book
FIDIC Silver Book Introduction to FIDIC Silver Book Introduction FIDIC – the International Federation of Consulting Engineers – published in September 1999 a suite of four new Standard Forms of Contract. This new suite comprises: Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer : The Construction Contract Conditions of …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-silver-book/
FIDIC Orange Book
FIDIC Orange Book Orange Book Conditions of Contract for Design-Build and Turnkey First Edition 1995 Contents of Contract Book _ General Conditions _ Guidance for the Preparation of the Particular Conditions _ Forms of Tender and Agreement The Orange book was published in 1995 to provide a design and build option to the then current FIDIC …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-orange-book/
FIDIC Yellow Book
FIDIC Yellow Book FIDIC Yellow Book Conditions of Contract for Plant and Design-Build For electrical and mechanical plant, and for building works, designed by the Contractor First Edition 1999 The Yellow Book provides conditions of contract for construction works where the design is carried out by the Contractor. The current Yellow Book bears little resemblance to its predecessors. The …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-yellow-book/
FIDIC Red Book
FIDIC Red Book The New 2017 FIDIC Red Book FIDIC Red Book Introduction and FIDIC Core Principles Second Edition 2017 (first Ed 1999): Red Book – Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer; Yellow Book 1999 – Conditions of Contract for Plant and Design Build, for Electrical …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-red-book/
FIDIC RAINBOW SUITE
FIDIC RAINBOW SUITE The International Federation of Consulting Engineers In today’s world, the construction industry is expanding rapidly. With the rise in the number of infrastructure projects, it is important to have a standardized contract agreement between parties. One such agreement that has gained popularity is the FIDIC Rainbow Suite. In this article, we …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/
Pricing variation
Pricing variation Variation In Writing Because of the many different categories of legal claim made under the heading of variation claims, there are many ways in which the so-called variations are priced. The most straight forward variation claim is that based on debt. For example a contract may provide that if the owner directs the …
Permanent link to this article: http://www.e-basel.com/project-management/pricing-variation/