Claims Under FIDIC Contract CLAIMS UNDER THE NEW FIDIC CONDITIONS OF CONTRACT Conditions of Contract for Construction, FIDIC Forms. It is known as ‘the Red Book’. The FIDIC Conditions are used extensively on international construction projects, notably for major infrastructure work. The FIDIC Forms are used on projects funded by the World Bank, and the drafts …
Page Tags: Contractual Procedures
Permanent link to this article: https://www.e-basel.com/fidic-rainbow-suite/claims-under-fidic-contract/
FIDIC Red Book
FIDIC Red Book The New 2017 FIDIC Red Book FIDIC Red Book Introduction and FIDIC Core Principles Second Edition 2017 (first Ed 1999): Red Book – Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer; Yellow Book 1999 – Conditions of Contract for Plant and Design Build, for Electrical …
Permanent link to this article: https://www.e-basel.com/fidic-rainbow-suite/fidic-red-book/