Variation Claims Under Contract Construction Variation Claims Construction variation claims refer to disputes that arise when changes are made to the original scope of work agreed upon in a construction contract. These changes can include alterations to the design, materials, or schedule of the project, and can be initiated by either the client or the …
Page Tags: Construction Contract
Permanent link to this article: http://www.e-basel.com/construction-claims/variation-under-contract/
FIDIC Orange Book
FIDIC Orange Book Orange Book Conditions of Contract for Design-Build and Turnkey First Edition 1995 Contents of Contract Book _ General Conditions _ Guidance for the Preparation of the Particular Conditions _ Forms of Tender and Agreement The Orange book was published in 1995 to provide a design and build option to the then current FIDIC …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-orange-book/
FIDIC Yellow Book
FIDIC Yellow Book FIDIC Yellow Book Conditions of Contract for Plant and Design-Build For electrical and mechanical plant, and for building works, designed by the Contractor First Edition 1999 The Yellow Book provides conditions of contract for construction works where the design is carried out by the Contractor. The current Yellow Book bears little resemblance to its predecessors. The …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-yellow-book/
FIDIC Red Book
FIDIC Red Book The New 2017 FIDIC Red Book FIDIC Red Book Introduction and FIDIC Core Principles Second Edition 2017 (first Ed 1999): Red Book – Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer; Yellow Book 1999 – Conditions of Contract for Plant and Design Build, for Electrical …
Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-red-book/