Page Tags: variation

Variation Claims

Variation Claims

Variation Claims Under Contract  Construction Variation Claims Construction variation claims refer to disputes that arise when changes are made to the original scope of work agreed upon in a construction contract. These changes can include alterations to the design, materials, or schedule of the project, and can be initiated by either the client or the …

Continue reading

Permanent link to this article: http://www.e-basel.com/construction-claims/variation-under-contract/

FIDIC DBO Contract

FIDIC DBO book

FIDIC DBO Contract   DBO Contract Conditions of Contract for Design, Build and Operate Projects First Edition 2008 Contents of Contract Book _ General Conditions _ Particular Conditions _ Sample Forms   Following publication of the Orange Book in 1995 and the Red, Yellow and Green Books in 1999 it became clear that there was a growing need …

Continue reading

Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-dbo-contract/

FIDIC Yellow Book

FIDIC Yellow Book

FIDIC Yellow Book FIDIC Yellow Book Conditions of Contract for Plant and Design-Build For electrical and mechanical plant, and for building works, designed by the Contractor First Edition 1999 The Yellow Book provides conditions of contract for construction works where the design is carried out by the Contractor. The current Yellow Book bears little resemblance to its predecessors. The …

Continue reading

Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-yellow-book/

FIDIC Red Book

FIDIC Red Book

FIDIC Red Book The New 2017 FIDIC Red Book FIDIC Red Book  Introduction and FIDIC Core Principles   Second Edition 2017 (first Ed 1999): Red Book – Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer; Yellow Book 1999 – Conditions of Contract for Plant and Design Build, for Electrical …

Continue reading

Permanent link to this article: http://www.e-basel.com/fidic-rainbow-suite/fidic-red-book/

Pricing variation

Pricing variation Variation In Writing Because of the many different categories of legal claim made under the heading of variation claims, there are many ways in which the so-called variations are priced. The most straight forward variation claim is that based on debt. For example a contract may provide that if the owner directs the …

Continue reading

Permanent link to this article: http://www.e-basel.com/project-management/pricing-variation/

Variation Claims

variation Calim

Variation Claims the reason most often given by builders ( Contractor ) for making a claim against the owner for remuneration over and above the original contract price is that ” there was a variation “. there is a widespread misconception in the construction industry that a contractor is entitled to be paid a fair …

Continue reading

Permanent link to this article: http://www.e-basel.com/articles/variation-claims/